Connection tariffs

Sverdlovenergo

According to decree of Sverdlovsk REK #16-PK dd. 11.02.2009, we had the following connection fees till April 16, 2010:

  Tariff zones
  Zone 1 Zone 2 Zone 3
Voltage class 0.4
кV
6-10
кV
0.4
кV
6-10
кV
0.4
кV
6-10
кV
Connection rates, RUR/kW, no VAT 8 933 12 847 2 792 8 868 1 685 6 143

On April 16, 2010 a new decree (#35-PK dd. 07.04.2010) approved the following connection rates:

  Tariff zones
  Zone 1 and 2 Zone 3
Connected capacity, kW Over 15 and up to 100 inclusive Over 100 up to 8500 Over 15 and up to 100 inclusive Over 100 up to 8500
Connection rates, RUR/kW, no VAT 5 471 10 606 1 896 5 731

On December 15, 2010 a new decree (#161-PK) approved new connection rates, calculated under recent changes in Federal Law #35-FZ dd. 26.03.2003 “On Energy Sector”, coming into force since January 01, 2011.

  Tariff group
  Group 1 and 2 Group 3
Connected capacity, kW Over 15 and up to 100 inclusive Over 100 up to 4500 inclusive Over 15 and up to 100 inclusive Over 100 up to 4500 inclusive
Connection rates, RUR/kW, no VAT 3 793 4 585 1 926 1 779

Permenergo

During the reported period the following connection rates, approved by decree of Perm REK #10-e dd.28.04.2009, were in effect:

Voltage class Connected capacity Basic connection rates, RUR/kW (no VAT)
    Supply reliability category
    III category II category I category
Low voltage (0.4 kV) Over 15 up to 30 kW inclusive 11 257 14 633 16 322
  Over 30 kW up to 100 kW inclusive 9 812 12 755 14 226
  Over 100 kW up to 750 kW inclusive 10 338 13 438 14 990
Average voltage II (6-10 kV) Up to 100 kW inclusive 9 606 12 487 13 928
  Over 100 kW up to 750 kW inclusive 9 000 11 700 13 050
  Over 750 kW 8 032 10 441 11 646

There are also multiplying and reduction factors in supply zones (from 0.6 to 1.31).

Since January 02, 2011 decree #97-e dd. December 28, 2010 introduced new connection rates:

Voltage class Connected capacity Basic connection rates, RUR/kW (no VAT)
    Supply reliability category
    III category II category I category
Low voltage (0.4 kV) Over 15 up to 30 kW inclusive 9 812 12 755 14 226
  Over 30 kW up to 100 kW inclusive 9 812 12 755 14 226
  Over 100 kW up to 750 kW inclusive 10 338 13 438 14 990
Average voltage II (6-10 kV) Up to 100 kW inclusive 9 606 12 487 13 928
  Over 100 kW up to 750 kW inclusive 9 000 11 700 13 050

Chelyabenergo

In 2010 we were guided by decree of Chelyabinsk ETO #49/64 dd. December 25, 2009 stipulating a connection rate only for applicants with capacity up to 15 kW (approved by FST decree #201-e1). For all other applicants connection fees were approved individually. Since January 01, 2011 a new decree (#52/71 dd. December 30, 2010) retains individual approach for all applicants with capacity over 15 kW.